Komatsu 550 US Ton Straight Side Mechanical Press. 118.11" x 51.18" Bed area, 11.81" Stroke, 33.07" Shut height over the bolster, and 20-40 SPM.
I. Slide Assembly
A. Remove from press, and completely disassemble.
B. Check adjustment screws and nuts to make sure everything is in good working order. Cleaned up and tested to make sure that there isn’t any excess clearance.
C. Checked adjustment screw housings and adjustment assemblies, that all are in good working order. Clean and Chase all threads to make sure that they are in good working order.
D. Removed Overload assemblies, and replaced all seals and packings in Overloads. Checked Piston and polished to make sure that a proper seal is maintained in the overloads.
E. Check Overload Pump and valve and make sure in good operating condition. Rebuild valve if necessary, and replace Overload pump if necessary (will advise).
F. Skim cut bottom of slide face to make sure parallelism is attained.
II. Bolster Plate
A. Removed bolster plate and skim cut top and bottom to parallel.
III. Gibbs/Ways
A. Replaced all Micarta wear plates on slide assembly with new liners
B. Machined front and back gibbs to parallel.
C. Reinstalled back into press and made sure all adjustment mechanisms are working correctly.
IV. Counterbalance Assemblies
A. Disassembled and polished rods and pistons and cleaned out cylinder to make sure that everything is properly moving without and burrs/friction.
B. Replaced all seals, packings, and guide bushings.
C. Reassembled and benched test to make sure that there is no leaks.
V. Includes replacement of wrist pin bushings (2), and connection Arm Bushings (2).
VI. Lubrication and Air System
A. Tested all Lubrication Blocks, to make sure everything is clean and in good working order. Replaced any cinked or damaged lubrication Lines.
B. Tested Lube motor and pump and made sure it was properly cycling lube through the system.
C. Checked and replaced any air filters and regulators that were found to be questionable.
D. Made sure that the press was receiving proper air pressure throughout
entire system.
VII. Clutch/Brake Assembly
A. Disassemble and check condition of all clutch and brake plates and advise.
B. Have all clutch/brake plates skim cut to clean up.
C. Replace all liners for clutch/brake assembly
D. Replace all packings and seals.
E. Test springs; if they show any sign of wear, replace with new.
F. Reassemble all components and test for leaks.
VIII. Thoroughly sanded and prepped press to be painted.
A. Will be painting press the specific color that Rosco Incorporated requests, once all rebuild work is to be completed.
Model Number…………………........….......E2F 500
Serial Number………………………………. 10016
Capacity.... ................................................. 550 Tons US Tons
Year of Manufacture……………………….. 1986
Bed Area........................................................ 118.11” x 51.18”
Slide Area………………………………….. 118.11” x 47.24”
Stroke............................................................. 11.81”
Adjustment..................................................... 9.84”
Shut Height.................................................... 33.07” over bolsterSDAU
Strokes per Minute.........................................20-40
Bolster……………………………………… 8” thick approx.
Windows…………………………………… 48” wide x 32” tall
Trabon Recirculating Lubrication System
Power Supply: 480V/60 HZ/ 3 Phase
T-slotted Bolster and Ram
Wintriss Smart Pac 2 Press Controller
DSI 2 Wintriss Die Protection (8 Inputs)
Light Curtains
8 Point Gibbing
Variable Speed Motor
Jet Set Pac Lube Sprayer
Air Clutch and Brake Assembly
Air Counterbalances
Vibration Isolation Levelers